Fabricators & erectors
Weights and piece counts organized for shop and field pricing, so you can bid more packages.
- Piece counts by shape
- Erection areas & sequence
For steel & metals contractors
Structural steel, metal deck and miscellaneous metals quantified member by member, with weights and pieces counted, so fabricators and erectors can bid with confidence.
Three-story office building
Illustrative example
Every member, deck panel and miscellaneous item pulled from the structural and architectural sheets.
Beams, girders and columns by shape and length, with weight per member.
Braces, gussets and heavier members at lateral systems.
Open-web joist counts by designation, with bridging and bearing details.
Roof and floor deck by gauge and profile, with closures and edge forms.
Steel stairs by flight, plus guardrails and handrails by linear foot.
Lintels, shelf angles and relieving angles at openings and veneer.
Embed plates, anchor bolts and base plates counted by type.
Ladders, bollards, pipe supports, frames and other Division 05 items.
Plates, bolts and welds carried as a weight allowance you can adjust.
Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.
Grid A–D: W-beams
98 pieces · 64.2 TON
Moment frame, line 3
W24 & W14 · 21.6 TON
1.5" 20 GA roof deck
52,000 SF
Stair S-1 & rails
2 flights · 190 LF
Every measurement is color-coded and tied to its sheet number.
| Item | CSI | Net | Unit | Allow. | Gross |
|---|---|---|---|---|---|
| W-shape beams & girders | 05 12 00 | 186.4 | TON | 8% | 201.3 |
| HSS columns | 05 12 00 | 42.8 | TON | 8% | 46.2 |
| Steel stair stringers & pans | 05 51 00 | 6.2 | TON | 5% | 6.5 |
| 1.5" 20 GA roof deck | 05 31 23 | 52,000 | SF | 5% | 54,600 |
| 2" composite floor deck | 05 31 13 | 34,600 | SF | 5% | 36,330 |
| 1-1/2" pipe railings | 05 52 00 | 380 | LF | 5% | 399 |
| Total steel weight | 235.4 | TON | — | 254.0 | |
Live formulas: change any waste factor and the gross quantity updates.
Illustrative example. Connection material is carried as a visible allowance on member weight, not hidden in unit prices.
Steel pricing moves fast. We separate each cost group so you can update material without reworking labor.
Cost group 01
Steel by shape and weight, deck by gauge, and shop items priced for current mill and service-center pricing.
Current steel pricing
Cost group 02
Fabrication and erection hours by piece count, connection type and building height.
Pieces per crew-day
Cost group 03
Cranes, lifts, welders and rigging sized to the heaviest picks and the schedule.
Crane & rigging
Cost group 04
Shop drawings, inspections, coatings and the markup you set.
Your markup & contingency
Organized for fabricators, erectors, GCs and service centers.
Weights and piece counts organized for shop and field pricing, so you can bid more packages.
An independent steel quantity to compare fabricator bids and confirm misc. metals aren't missed.
Material lists by shape and size your sales team can quote fast.
Every member shows shape, length and weight per foot, so totals are easy to audit.
Lintels, embeds, ladders and bollards are pulled from both architectural and structural sheets.
Connection weight is a visible percentage, not buried in unit prices.
Packages arrive with time to get mill and service-center pricing.
Changed members are clouded on the updated markups.
“We use Bidnora for overflow when we're bidding several jobs at once. Their numbers line up with the sub bids we get back, which is exactly what we need.”
Send what you have and we'll reply with a fixed price and delivery date before any work starts.
The same detail and turnaround for every specialty trade on the job.
Yes. Every member is listed by shape and length with its weight, and totals are summarized by area, level and member type.
Send your structural and architectural drawings for a fixed quote on a complete metals takeoff.