Plumbing contractors
Bid more jobs with fixtures and piping already broken out by system and size.
- Pipe by system & size
- Fixture counts by unit type
For plumbing contractors
Fixtures, piping, fittings and equipment measured by system and pipe size from your P-sheets, so your plumbing bid covers every run from the main to the last trap.
Multi-family building, 64 units
Illustrative example
Every fixture, pipe run and piece of equipment, kept separate by system the way you price it.
Toilets, lavatories, sinks, showers and drains counted from the fixture schedule.
Hot and cold water piping by material and size, with valves and hangers.
Waste and vent piping by size, with cleanouts and fittings.
Roof drains, overflow drains and storm piping to the building exit.
Natural gas piping by size to each appliance, with regulators and valves.
Water heaters, pumps, backflow preventers and expansion tanks.
Fitting counts or allowances by type, plus isolation and balancing valves.
Insulation by pipe size and thickness where specified.
Under-slab piping, trenching and site utility connections.
Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.
Unit type A: fixtures
6 per unit × 40 units
Domestic water risers
PEX 3/4"–2"
Sanitary stack S-3
4" PVC · 6 floors
Roof drains RD-1 to RD-8
8 EA · 4" storm
Every measurement is color-coded and tied to its sheet number.
| Item | CSI | Net | Unit | Waste | Gross |
|---|---|---|---|---|---|
| Plumbing fixtures, per schedule | 22 40 00 | 412 | EA | — | 412 |
| PEX domestic water, 1/2"–1" | 22 11 16 | 14,800 | LF | 10% | 16,280 |
| Copper Type L, 1-1/4"–2" | 22 11 16 | 1,260 | LF | 5% | 1,323 |
| PVC sanitary & vent, 1-1/2"–4" | 22 13 16 | 9,640 | LF | 10% | 10,604 |
| Cast iron storm, 4" | 22 14 13 | 860 | LF | 5% | 903 |
| Pipe insulation, 1" | 22 07 19 | 6,420 | LF | 5% | 6,741 |
Live formulas: change any waste factor and the gross quantity updates.
Illustrative example. Vertical runs are measured from the riser diagrams, not just plan views.
Each system and material is priced on its own, so substitutions and changes are easy to re-price.
Cost group 01
Fixtures, pipe, fittings, valves and equipment at current distributor pricing for your area.
Distributor pricing
Cost group 02
Hours by fixture, pipe size and material, adjusted for height and building type.
Labor units per item
Cost group 03
Lifts, threading machines, press tools and excavation for the job.
Lifts & press tools
Cost group 04
Permits, testing, disinfection and the markup you set.
Your markup & contingency
Organized for plumbing contractors, GCs and supply houses.
Bid more jobs with fixtures and piping already broken out by system and size.
Independent plumbing quantities to compare subs and confirm storm and gas aren't missed.
Fixture and pipe lists your sales team can quote quickly.
Domestic, sanitary, vent, storm and gas are kept separate, the way you price them.
Every fixture tag is counted and checked against the schedule.
Vertical runs come from riser diagrams, not just plan views.
Count fittings individually or carry an allowance; you choose.
Changed runs and fixtures are clouded on updated sheets.
“We use Bidnora for overflow when we're bidding several jobs at once. Their numbers line up with the sub bids we get back, which is exactly what we need.”
Send what you have and we'll reply with a fixed price and delivery date before any work starts.
The same detail and turnaround for every specialty trade on the job.
Yes. Domestic water, sanitary, vent, storm and gas piping are measured and reported separately, by material and size.
Upload your P-sheets and get a fixed quote for a complete plumbing takeoff.