Plumbing Estimating & Takeoff Services

Fixtures, piping, fittings and equipment measured by system and pipe size from your P-sheets, so your plumbing bid covers every run from the main to the last trap.

  • CSI Division 22 coverage
  • Pipe by system & size
  • Fixtures from schedules
DWG P-201 · Plumbing plan, level 2

Multi-family building, 64 units

Illustrative example

QA checked
  • Fixtures by type412 EA
  • PEX domestic water14,800 LF
  • PVC sanitary & vent9,640 LF
  • Water heaters64 EA
CSI 22 11 00 Facility water distributionExcel ready
Turnaround
48–72 hr
Typical for commercial plumbing
Units
EA & LF
Fixtures, piping and fittings
Systems
Separated
Domestic, sanitary, vent and storm
Coverage
Division 22
Plus gas and site utilities
Scope coverage

Complete Plumbing Quantities by System

Every fixture, pipe run and piece of equipment, kept separate by system the way you price it.

  • Fixtures

    Toilets, lavatories, sinks, showers and drains counted from the fixture schedule.

  • Domestic water

    Hot and cold water piping by material and size, with valves and hangers.

  • Sanitary & vent

    Waste and vent piping by size, with cleanouts and fittings.

  • Storm drainage

    Roof drains, overflow drains and storm piping to the building exit.

  • Gas piping

    Natural gas piping by size to each appliance, with regulators and valves.

  • Equipment

    Water heaters, pumps, backflow preventers and expansion tanks.

  • Fittings & valves

    Fitting counts or allowances by type, plus isolation and balancing valves.

  • Pipe insulation

    Insulation by pipe size and thickness where specified.

  • Underground & site

    Under-slab piping, trenching and site utility connections.

What you receive

See What You Receive in Your Plumbing Package

Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.

Marked-up plan sheet (.PDF)Vector

Unit type A: fixtures

6 per unit × 40 units

Domestic water risers

PEX 3/4"–2"

Sanitary stack S-3

4" PVC · 6 floors

Roof drains RD-1 to RD-8

8 EA · 4" storm

Every measurement is color-coded and tied to its sheet number.

Itemized takeoff sheet (.XLSX)Unlocked
Sample plumbing takeoff quantities
ItemCSINetUnitWasteGross
Plumbing fixtures, per schedule22 40 00412EA—412
PEX domestic water, 1/2"–1"22 11 1614,800LF10%16,280
Copper Type L, 1-1/4"–2"22 11 161,260LF5%1,323
PVC sanitary & vent, 1-1/2"–4"22 13 169,640LF10%10,604
Cast iron storm, 4"22 14 13860LF5%903
Pipe insulation, 1"22 07 196,420LF5%6,741

Live formulas: change any waste factor and the gross quantity updates.

Illustrative example. Vertical runs are measured from the riser diagrams, not just plan views.

How we price

How We Price Your Plumbing Bid

Each system and material is priced on its own, so substitutions and changes are easy to re-price.

  1. Cost group 01

    Materials

    Fixtures, pipe, fittings, valves and equipment at current distributor pricing for your area.

    Distributor pricing

  2. Cost group 02

    Labor

    Hours by fixture, pipe size and material, adjusted for height and building type.

    Labor units per item

  3. Cost group 03

    Equipment

    Lifts, threading machines, press tools and excavation for the job.

    Lifts & press tools

  4. Cost group 04

    Overhead & Profit

    Permits, testing, disinfection and the markup you set.

    Your markup & contingency

Who it's for

Tailored Plumbing Estimating Workflows

Organized for plumbing contractors, GCs and supply houses.

Plumbing contractors

Bid more jobs with fixtures and piping already broken out by system and size.

  • Pipe by system & size
  • Fixture counts by unit type

General contractors

Independent plumbing quantities to compare subs and confirm storm and gas aren't missed.

  • System-by-system check
  • Bid leveling support

Plumbing suppliers

Fixture and pipe lists your sales team can quote quickly.

  • Fixture schedule totals
  • Pipe & fitting lists
Why Bidnora

Why Plumbing Contractors Choose Bidnora

  1. 1

    Organized by system

    Domestic, sanitary, vent, storm and gas are kept separate, the way you price them.

  2. 2

    Fixtures from the schedule

    Every fixture tag is counted and checked against the schedule.

  3. 3

    Risers and drops included

    Vertical runs come from riser diagrams, not just plan views.

  4. 4

    Fittings your way

    Count fittings individually or carry an allowance; you choose.

  5. 5

    Revisions tracked

    Changed runs and fixtures are clouded on updated sheets.

“We use Bidnora for overflow when we're bidding several jobs at once. Their numbers line up with the sub bids we get back, which is exactly what we need.”
Sarah J.Chief Estimator, general contractor · Denver, CO

Estimates built with industry-standard software

  • PlanSwift
  • Bluebeam Revu
  • RSMeans Data
  • On-Screen Takeoff
  • Microsoft Excel
Free quote

Get a Plumbing Takeoff Quote

Send what you have and we'll reply with a fixed price and delivery date before any work starts.

What to send

  • Drawings as PDF or CAD files, or a plan-room link
  • Specifications, or just the sections for your scope
  • Any addenda issued so far
  • Your bid date and anything to include or exclude

Request a Plumbing Quote

Get a fixed price and delivery date for your plans.

Upload plans / specs (optional)

Drag & drop files here, or browse

PDF, DWG, DXF, ZIP or images · up to 100 MB total

Text message consent (optional)

See our Privacy Policy and SMS Terms.

Confidential. Prefer more detail? Use the full quote form

Common questions

Plumbing Estimating FAQ

Yes. Domestic water, sanitary, vent, storm and gas piping are measured and reported separately, by material and size.

Ready for bid day

Pricing a Plumbing Job?

Upload your P-sheets and get a fixed quote for a complete plumbing takeoff.

  • 100% confidential
  • NDA on request
  • Fixed price before we start
CallGet a Quote