Electrical Estimating & Takeoff Services

Devices, fixtures, conduit, wire and gear counted from your E-sheets and panel schedules, so your electrical bid covers every circuit on the drawings.

  • CSI Division 26 coverage
  • Counts by panel & circuit
  • Low-voltage options
DWG E-201 · Power plan, level 2

Office building fit-out

Illustrative example

QA checked
  • Receptacles & devices1,284 EA
  • Light fixtures by type642 EA
  • 3/4" EMT conduit18,400 LF
  • #12 THHN copper61,200 LF
CSI 26 05 00 Common work resultsExcel ready
Turnaround
48–72 hr
Typical for commercial electrical
Units
EA & LF
Devices, fixtures, conduit and wire
Gear
From schedules
Panels, transformers and switchgear
Coverage
Division 26
Plus 27 & 28 low voltage
Scope coverage

Complete Electrical Quantities

Every symbol, run and schedule on the E-sheets, counted and grouped the way you price.

  • Devices

    Receptacles, switches, data outlets and floor boxes counted by type.

  • Lighting

    Fixtures by type from the lighting schedule, with controls and sensors.

  • Conduit & raceway

    Branch and feeder conduit by size and type, with fittings and supports.

  • Wire & cable

    Conductors by size from homeruns and circuit lengths, plus MC cable.

  • Distribution gear

    Switchgear, panels, transformers and disconnects from the one-line.

  • Feeders

    Feeder runs by size between gear, with pull boxes and terminations.

  • Grounding & bonding

    Grounding electrodes, conductors and bonding jumpers.

  • Low voltage

    Data, fire alarm, security and AV rough-in when in your scope.

  • Site electrical

    Site lighting, underground duct banks and service entrance work.

What you receive

See What You Receive in Your Electrical Package

Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.

Marked-up plan sheet (.PDF)Vector

Open office: devices

412 EA

Lighting: types A & B

286 fixtures

3/4" EMT branch conduit

18,400 LF

Panels LP-2A & LP-2B

2 × 42-circuit

Every measurement is color-coded and tied to its sheet number.

Itemized takeoff sheet (.XLSX)Unlocked
Sample electrical takeoff quantities
ItemCSINetUnitWasteGross
Duplex receptacles, 20A26 27 26846EA—846
2×4 LED troffers26 51 00412EA—412
3/4" EMT conduit26 05 3318,400LF10%20,240
#12 THHN copper26 05 1961,200LF10%67,320
MC cable, 12/226 05 199,800LF10%10,780
Panelboards, 42-circuit26 24 166EA—6

Live formulas: change any waste factor and the gross quantity updates.

Illustrative example. Counts are grouped by floor and panel and organized for easy import into estimating software.

How we price

How We Price Your Electrical Bid

Copper and gear prices change weekly. Keeping cost groups separate makes updates painless.

  1. Cost group 01

    Materials

    Devices, fixtures, conduit, wire and gear priced with current copper and distributor pricing.

    Current copper pricing

  2. Cost group 02

    Labor

    Hours per device, fixture and foot of conduit, adjusted for height and building type.

    Labor units per item

  3. Cost group 03

    Equipment

    Lifts, wire pullers, benders and trenching for the job.

    Lifts & pulling

  4. Cost group 04

    Overhead & Profit

    Permits, inspections, temporary power and the markup you set.

    Your markup & contingency

Who it's for

Tailored Electrical Estimating Workflows

Organized for electrical contractors, GCs and distributors.

Electrical contractors

Bid more projects with device, fixture and conduit counts ready for your pricing software.

  • Counts by panel & floor
  • Import-friendly quantities

General contractors

An independent electrical count to level sub bids and check gear and low-voltage scope.

  • Gear & feeder check
  • Bid leveling support

Electrical distributors

Fixture and material lists to quote contractors quickly.

  • Fixture schedule totals
  • Conduit & wire lists
Why Bidnora

Why Electrical Contractors Choose Bidnora

  1. 1

    Every device counted

    Symbols are counted sheet by sheet and tied to their panel.

  2. 2

    Wire from real runs

    Conductor lengths come from homerun distances and circuit layouts, not rules of thumb.

  3. 3

    Gear from the one-line

    Panels, transformers and switchgear come from the schedules and riser.

  4. 4

    Low voltage optional

    Add fire alarm, data and security rough-in when they're in your scope.

  5. 5

    Revisions tracked

    Changed circuits and fixtures are clouded on the updated sheets.

“An addendum dropped two days before the bid and they turned the update around the next morning. The Excel files have live formulas, so we adjust margins ourselves.”
Dave K.Owner, electrical contractor · Atlanta, GA

Estimates built with industry-standard software

  • PlanSwift
  • Bluebeam Revu
  • RSMeans Data
  • On-Screen Takeoff
  • Microsoft Excel
Free quote

Get a Electrical Takeoff Quote

Send what you have and we'll reply with a fixed price and delivery date before any work starts.

What to send

  • Drawings as PDF or CAD files, or a plan-room link
  • Specifications, or just the sections for your scope
  • Any addenda issued so far
  • Your bid date and anything to include or exclude

Request a Electrical Quote

Get a fixed price and delivery date for your plans.

Upload plans / specs (optional)

Drag & drop files here, or browse

PDF, DWG, DXF, ZIP or images · up to 100 MB total

Text message consent (optional)

See our Privacy Policy and SMS Terms.

Confidential. Prefer more detail? Use the full quote form

Common questions

Electrical Estimating FAQ

Yes. Every device and fixture symbol is counted by type and grouped by floor, area or panel, matching the lighting and panel schedules.

Ready for bid day

Bidding an Electrical Job?

Upload your E-sheets and get a fixed quote for a complete electrical takeoff.

  • 100% confidential
  • NDA on request
  • Fixed price before we start
CallGet a Quote