Masonry subcontractors
Bid more block and brick packages without tying up your estimator on unit counts.
- Counts by wall type & elevation
- Accessory lists ready to order
For masonry contractors
CMU, brick and stone counted wall by wall, with mortar, grout, reinforcing and accessories included, so your masonry bid reflects what's actually drawn.
Two-story retail building
Illustrative example
Every wall measured by type, with openings deducted and the hidden materials counted too.
Block counts by size and type, with openings deducted and bond beams called out.
Face brick by wall area and bond pattern, with special shapes and soldier courses.
Natural and manufactured stone, sills, coping and trim pieces by size.
Mortar by unit count, and grout volumes for filled cells and bond beams.
Vertical bars by spacing, horizontal joint reinforcement and dowels to footings.
Steel and precast lintels and bond beam lengths at every opening.
Through-wall flashing, weeps, veneer ties and control joint materials.
Cavity insulation and air barrier areas where they're part of the masonry scope.
Wall heights and lengths to plan scaffolding, lifts and staging.
Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.
North elevation: 8" CMU
3,420 SF · 3,850 units
Brick veneer, modular
5,560 SF · 38,600 units
Bond beams at 4'-0" & roof
1,280 LF
Openings deducted (42 EA)
1,180 SF removed
Every measurement is color-coded and tied to its sheet number.
| Item | CSI | Net | Unit | Waste | Gross |
|---|---|---|---|---|---|
| 8" CMU, standard units | 04 22 00 | 11,090 | EA | 5% | 11,645 |
| 8" CMU, bond beam units | 04 22 00 | 960 | EA | 5% | 1,008 |
| Face brick, modular | 04 21 13 | 38,600 | EA | 5% | 40,530 |
| Type S mortar | 04 05 13 | 640 | BAG | 10% | 704 |
| Cell & bond beam grout | 04 05 16 | 41 | CY | 8% | 45 |
| Horizontal joint reinforcement, 9 GA | 04 05 19 | 9,860 | LF | 5% | 10,353 |
Live formulas: change any waste factor and the gross quantity updates.
Illustrative example. Counts are grouped by elevation and wall type, so labor and material can be priced separately.
Masonry margins live in the details. We price each cost group on its own so you can see where the money goes.
Cost group 01
Block, brick, stone, mortar, grout and reinforcing priced from suppliers near your project.
Local supplier pricing
Cost group 02
Mason and tender hours by unit type, wall height and complexity, at the right wage rates for the job.
Units per mason-day
Cost group 03
Scaffolding, mast climbers, forklifts, mixers and saws for the length of the work.
Access & mixing
Cost group 04
Cold-weather protection, cleanup, testing and the markup you set.
Your markup & contingency
Organized for the people who build, buy and supply masonry.
Bid more block and brick packages without tying up your estimator on unit counts.
Check masonry sub bids against independent counts and catch missing lintels, flashing or reinforcing.
Unit counts and accessory lists your counter staff can quote quickly.
Openings are deducted and special units counted separately, so your order matches the wall.
Grout, rebar, ties and flashing are measured, not guessed.
Quantities by elevation, height and wall type make labor pricing faster.
When elevations change, updated counts show exactly what moved.
Your scope sheet spells out what's in and out before you sign.
“The color-coded markups make checking quantities quick. We bid more drywall and framing work last quarter than ever, without adding an estimator.”
Send what you have and we'll reply with a fixed price and delivery date before any work starts.
The same detail and turnaround for every specialty trade on the job.
Yes. Doors, windows and louvers are deducted from wall areas, and lintels or bond beams at each opening are counted separately.
Upload your drawings and get a fixed quote for a complete block, brick and stone takeoff.