Skip to content
Bidnora Engineering
Measured from your drawings

Quantity Takeoff Services

Precise counts, lengths, areas and volumes for every trade, measured from your drawings and delivered with color-coded markups so you can check any quantity in seconds.

  • 24–48 hrTypical single-trade turnaround
  • Color-codedMarkups tied to sheet numbers
  • Editable ExcelLive formulas, no locked cells

Request a Fast Project Quote

Get a fixed price and delivery date for your plans.

Upload plans / specs (optional)

Drag & drop files here, or browse

PDF, DWG, DXF, ZIP or images · up to 100 MB total

Text message consent (optional)

See our Privacy Policy and SMS Terms.

Confidential. Prefer more detail? Use the full quote form

Architectural blueprints spread out for a quantity takeoff
Bidnora EngineeringQuantity Takeoffs
Service overview

Accurate Quantities for Every Trade

A quantity takeoff is the foundation of every bid. We measure your plans sheet by sheet (counts, lengths, areas and volumes) and organize the results by trade, system and location so you can price them your way.

Each takeoff comes with color-coded markups that show exactly what was counted, plus waste factors and net-to-gross conversions, so your estimators can check quantities in minutes instead of re-measuring.

What you receive

  • Quantity workbook in Excel
  • Color-coded marked-up PDFs
  • Waste factors and net-to-gross conversions
  • Quantities by floor, area or phase
  • Scope notes and questions on unclear items

Who it's for

  • Subcontractors
  • General contractors
  • Material suppliers
  • In-house estimating teams

Software we use

  • Bluebeam Revu
  • PlanSwift
  • On-Screen Takeoff
  • Microsoft Excel
What's included

What's Included in Every Takeoff

Quantities you can price right away, organized the way your crews build.

  • Measured quantities

    Areas, linear footage, volumes and item counts for each scope, broken out by floor, area or phase.

    By level & areaNet & gross
  • Color-coded markups

    Every measurement drawn on the plans in a consistent color per item, so reviewers see exactly what was counted.

    Vector PDFBluebeam-ready
  • Waste & lap factors

    Waste, overlap and cut-off allowances applied per material and shown in their own column so you can change them.

    Material-specificEditable
  • Order-ready material lists

    Quantities converted into purchasable units such as sheets, bags, sticks, rolls and cartons for supplier quotes.

    Bill of materialsSupplier-ready
  • Scope notes & exclusions

    A written summary of what was included, what was left out and any assumptions made where drawings were unclear.

    Scope sheetRFI list
  • Editable Excel workbook

    An unlocked workbook with formulas intact, ready to drop into your pricing templates or estimating software.

    Live formulas.xlsx
Takeoff packages

Takeoff Packages for Every Bid

From a single trade to a full multi-trade quantity survey.

  1. Package 01

    Single-Trade Takeoff

    One scope, fully detailed

    For subcontractors bidding one trade, such as drywall, concrete, painting or electrical.

    Typical turnaround24–48 hrs
  2. Package 02 · Most requested

    Multi-Trade Takeoff

    Related scopes together

    Coordinated quantities for trades that interact, such as framing, drywall, insulation and ceilings.

    Typical turnaround48–72 hrs
  3. Package 03

    Full Quantity Survey

    All CSI divisions

    Complete quantities for the whole building, used by GCs to check sub coverage and build a master budget.

    Typical turnaround3–5 days
  4. Package 04

    Revisions & Addenda

    After the first takeoff

    Updated quantities when drawings change, with revised items clouded so you can see the difference.

    Typical turnaround24 hrs
How we work

Our 5-Step Takeoff Process

Built to give you quantities you can trust without re-checking every sheet.

  1. 1

    Send your plans

    Upload the drawing set and tell us which trades and scope items you need measured.

  2. 2

    Scope confirmation

    We confirm what's in and out of scope and list any missing information before measuring.

  3. 3

    Measure & mark up

    Estimators measure every item in Bluebeam or PlanSwift, color-coding each one on the drawings.

  4. 4

    Apply waste & convert units

    Waste factors are applied and quantities converted into the units your suppliers sell.

  5. 5

    QA check & delivery

    A second estimator spot-checks quantities before you receive the workbook and marked-up PDFs.

Plan markup · Sheet A-102Scale 1/4" = 1'-0"

Area A: Level 1 ceilings

6,820 SF · 2×2 ACT

Area B: Partition type P3

1,140 LF · 10' high

Area C: Corridor flooring

2,960 SF LVT · 1,320 LF base

QA checked
Layered vector PDFLinked Excel quantities
Sample deliverable

What a Finished Takeoff Looks Like

Measured quantities, waste and order units side by side, so you can price or order straight from the sheet.

Medical office fit-out · drywall, ceilings & flooringQuantities onlyIllustrative example
Live formulas, unlocked cellsPricing can be added with a full cost estimate
Medical office fit-out · drywall, ceilings & flooring
CSI codeItemMeasuredUnitWasteOrder qtyOrder unit
Division 09 — Drywall & framing
09 22 163-5/8" 20 GA studs @ 16" O.C., 10' walls1,140LF5%898studs (10')
09 29 005/8" Type X gypsum board, both sides22,800SF10%784sheets (4×8)
09 29 00All-purpose joint compound22,800SF—46boxes (4.5 gal)
Division 09 — Ceilings
09 51 132×2 acoustical ceiling tile6,820SF5%112cartons (16 pcs)
09 51 13Main runners, 12'6,820SF5%149pieces
Division 09 — Flooring
09 65 19Luxury vinyl plank, 6×482,960SF8%89cartons (36 SF)
09 65 134" rubber wall base1,320LF5%24rolls (60')
  • Marked-up PDF drawings included
  • Unlocked Excel (.xlsx)
  • Rush turnaround available
Get the Full Sample Package
Project types

Project Sectors We Estimate

Experience across commercial, residential, institutional and public work in all 50 states.

  • Residential

    Custom homes, additions, remodels and production housing, from single plans to whole subdivisions.

    Custom to production

  • Commercial Office

    Core-and-shell buildings, tenant fit-outs, renovations and corporate interiors.

    Shell & interiors

  • Retail & Hospitality

    Restaurants, retail centers, hotels and multi-site rollouts that need consistent pricing.

    Single site or rollout

  • Multi-Family

    Garden-style, podium and mid-rise apartments, senior living and student housing.

    Wood, podium & mid-rise

  • Industrial & Warehouse

    Distribution centers, manufacturing plants, cold storage and flex buildings.

    Tilt-up & pre-engineered

  • Healthcare

    Medical offices, clinics, surgical centers and hospital renovations with specialty systems.

    Specialty MEP

  • Education

    K-12 schools, university buildings, labs and athletic facilities, including phased work.

    Prevailing wage ready

  • Public Works & Civil

    Municipal buildings, fire and police stations, parks and site infrastructure.

    Public bid formats

Why Bidnora

Quantities You Don't Have to Re-Check

A takeoff is only useful if you trust it. Ours are built so you can verify any line quickly and move on to pricing.

  • Traceable to the sheet: Every line in the workbook references the drawing it came from.

  • Organized your way: Group quantities by floor, area, phase or system to match how you price and schedule.

  • Supplier-ready units: Order quantities come in the units your suppliers sell, so material quotes come back faster.

  • Revisions handled: Drawing changes before bid day are measured and highlighted on the updated sheets.

“The color-coded markups make checking quantities quick. We bid more drywall and framing work last quarter than ever, without adding an estimator.”
Marcus V.Preconstruction Manager, drywall contractor · Dallas, TX
Common questions

Quantity Takeoffs FAQs

A takeoff gives you measured quantities and materials. A cost estimate adds labor, material and equipment pricing, overhead and profit to produce a complete bid price. Many subcontractors order takeoffs and apply their own pricing.

Ready for bid day

Get Accurate Quantities for Your Next Bid

Upload your plans and tell us the trades you need. You'll get a fixed quote and delivery date before we start.

  • 100% confidential
  • NDA on request
  • Fixed price before we start
CallGet a Quote