Concrete subcontractors
Respond to more bid invitations without late nights on takeoffs, and add capacity during busy bid weeks without hiring.
- Formwork and rebar cut lists
- Pour breakdowns by area
For concrete contractors
Concrete yardage, rebar tonnage and formwork contact area measured straight from your drawings, so you can bid with confidence, avoid over-ordering and turn commercial bids around in 24–48 hours.
Commercial slab & footings
Illustrative example
We measure every cubic yard, square foot and linear foot so nothing is left off your bid, from mud mats to tie wire.
Spread, continuous and stepped footings with volumes, edge forms and dowel counts.
Slab areas by thickness, thickened edges, depressions, joints and vapor barrier.
Slab-on-metal-deck pours, post-tensioned slabs, shoring and edge forms.
Foundation, stem and retaining walls with two-sided form area and wall ties.
Round and square columns, drilled piers and grade beams with cage steel.
Bar lists by size with laps, hooks and chairs, plus welded wire mesh by roll or sheet.
Anchor bolts, embed plates, dowels and sleeves counted by type.
Sidewalks, curbs, gutters, aprons, ADA ramps and heavy-duty paving.
Crushed stone base, sand cushion, fine grading and compaction quantities.
Color-coded plan markups paired with an unlocked takeoff sheet you can load straight into your bid.
Zone 1: 6" SOG (4,000 PSI)
Net 28,400 SF · 526 CY
FTG-1: 36"×12" continuous
640 LF · 71.1 CY
8" stem wall (4,500 PSI)
3,420 SFCA · 84.4 CY
24" drilled piers (32 EA)
Cage steel 14.8 TON
Every measurement is color-coded and tied to its sheet number.
| Item | CSI | Net | Unit | Waste | Gross |
|---|---|---|---|---|---|
| 4,000 PSI slab on grade, 6" | 03 30 00 | 526 | CY | 5% | 553 |
| Continuous footings, 36"×12" | 03 30 00 | 71.1 | CY | 8% | 76.8 |
| Stem walls, 8" (4,500 PSI) | 03 30 00 | 84.4 | CY | 5% | 88.6 |
| #5 Grade 60 rebar, footings & slab | 03 21 00 | 18,240 | LF | 10% | 20,064 |
| Edge formwork, up to 12" | 03 11 00 | 1,840 | LF | — | 1,840 |
| 15-mil under-slab vapor retarder | 07 26 00 | 28,400 | SF | 10% | 31,240 |
| Total concrete placement | 681.5 | CY | — | 718.4 | |
Live formulas: change any waste factor and the gross quantity updates.
Illustrative example. Quantities are measured net and shown gross with waste, so you can see exactly what was added.
We don't guess at unit rates. Every concrete bid is built from four cost groups, each shown separately.
Cost group 01
Ready-mix by PSI and mix design, rebar by the ton, vapor barrier, curing compound and accessories priced for your area.
Local supplier pricing
Cost group 02
Crew hours per yard and per square foot based on pour type, placement method and finish, at union or open-shop rates.
Production rates (MH/CY)
Cost group 03
Pump trucks, buggies, power trowels, screeds, vibrators and form rentals for the duration of the work.
Rental & pump minimums
Cost group 04
General conditions, mobilization, testing allowances and the markup you set for this bid.
Your markup & contingency
Set up for each role in the concrete supply chain.
Respond to more bid invitations without late nights on takeoffs, and add capacity during busy bid weeks without hiring.
Independent quantities to level concrete sub bids, check scope coverage and sanity-check budgets before awarding.
Fast bills of materials so your sales team can quote mix designs and reinforcing soon after drawings are released.
Waste factors set by element type prevent short loads without paying for extra yards.
Laps, hooks, dowels and chairs are included, so the fabricator's bill doesn't surprise you.
Your takeoff arrives with time left to adjust labor and pricing before the bid closes.
When the structural engineer issues changes, we update quantities and highlight what moved.
Written inclusions and exclusions help you defend your number with the GC.
“We use Bidnora for overflow when we're bidding several jobs at once. Their numbers line up with the sub bids we get back, which is exactly what we need.”
Send what you have and we'll reply with a fixed price and delivery date before any work starts.
The same detail and turnaround for every specialty trade on the job.
Yes. Reinforcing is broken out by bar size with total length and weight, lap splices based on the structural notes, and welded wire mesh by roll or sheet. Dowels, corner bars and chairs are listed too.
Upload your structural drawings and get a fixed quote and delivery date for your concrete takeoff.