Rebar Detailing
Cast-in-place concrete
Footings, walls, slabs, columns, beams and stairs detailed for placement and fabrication.
Rebar and steel shop drawings your fabricator can cut from and your crew can place from, with schedules, connection details and erection drawings coordinated to the contract documents.

We prepare reinforcing steel and structural steel shop drawings that fabricators can cut from and crews can install from: placing and erection drawings, assembly and piece drawings, bar bending schedules and connection details, all coordinated with the contract documents.
Every set is checked by a senior detailer before it goes out for approval, and engineer-of-record comments are turned around quickly so fabrication and deliveries stay on schedule.
Drawings and schedules prepared to the project specifications and standard detailing practice.
Plans, elevations and sections showing bar marks, sizes, spacing, laps and placement for every element.
Cut lengths, bend shapes and quantities by bar mark, organized for fabrication and delivery.
Fabrication drawings for beams, columns, braces and miscellaneous steel, with piece marks and dimensions.
Bolted and welded connections drawn clearly for fabrication and engineer review.
Anchor bolt plans, framing plans and erection sequences for the field crew.
Bills of materials with weights by member or bar mark, for ordering and progress billing.
From foundations to the roof, and from rebar to miscellaneous metals.
Cast-in-place concrete
Footings, walls, slabs, columns, beams and stairs detailed for placement and fabrication.
Framing & connections
Beams, columns, bracing and connections detailed for fabrication and erection.
Stairs, rails & embeds
Stairs, railings, lintels, embeds and support steel detailed to fit the architectural drawings.
Panel detailing
Panel layouts, reinforcement, embeds and lifting inserts for precast and tilt-up elements.
Coordinated with your engineer of record and fabricator from start to finish.
Send structural and architectural drawings, specifications and any answered RFIs.
We build the detailing model and raise conflicts or missing information as RFIs.
Placing drawings, shop drawings and schedules are produced with consistent marks and callouts.
A separate detailer checks every sheet against the contract documents before submittal.
Drawings go out for approval; we incorporate comments and issue fabrication releases.
Footing F-2: 4 #6 E.W.
Mark 6F2 · 8'-6"
Wall W-1: #5 @ 12" O.C.
Mark 5W1 · 10'-0"
Grade beam GB-3
#4 stirrups @ 8" O.C.
Every release comes with a bar list your fabricator can load directly, with weights for ordering and billing.
| Mark | Size | Qty | Length | Shape | Weight (lb) |
|---|---|---|---|---|---|
| Footings | |||||
| 6F2 | #6 | 96 | 8'-6" | Straight | 1,226 |
| 5F4 | #5 | 64 | 5'-0" | Straight | 334 |
| Walls & grade beams | |||||
| 5W1 | #5 | 210 | 10'-0" | Straight | 2,190 |
| 4GB3 | #4 | 180 | 6'-8" | Stirrup (T1) | 802 |
| 5D1 | #5 | 48 | 3'-0" | 90° hook (T2) | 150 |
Experience across commercial, residential, institutional and public work in all 50 states.
Custom homes, additions, remodels and production housing, from single plans to whole subdivisions.
Custom to production
Core-and-shell buildings, tenant fit-outs, renovations and corporate interiors.
Shell & interiors
Restaurants, retail centers, hotels and multi-site rollouts that need consistent pricing.
Single site or rollout
Garden-style, podium and mid-rise apartments, senior living and student housing.
Wood, podium & mid-rise
Distribution centers, manufacturing plants, cold storage and flex buildings.
Tilt-up & pre-engineered
Medical offices, clinics, surgical centers and hospital renovations with specialty systems.
Specialty MEP
K-12 schools, university buildings, labs and athletic facilities, including phased work.
Prevailing wage ready
Municipal buildings, fire and police stations, parks and site infrastructure.
Public bid formats
Every review cycle costs schedule. Our detailers aim to get it right on the first submittal.
Fewer review cycles: Drawings are checked against the contract documents before they reach the engineer.
RFIs raised early: Conflicts and missing details come up before fabrication, not after.
Field-friendly sheets: Layouts are arranged so crews find what they need quickly on site.
Fabrication-ready data: Schedules and material lists export cleanly for your shop's software.
“The color-coded markups make checking quantities quick. We bid more drywall and framing work last quarter than ever, without adding an estimator.”
Need single-scope detail? We prepare trade takeoffs organized the way specialty subcontractors price their work.
We follow the project specifications and standard industry practice for concrete reinforcing and structural steel detailing. If your project or fabricator has specific requirements, we'll match them.
Send the structural drawings and your schedule, and we'll reply with a fixed quote and release plan.