Commercial
Office, retail, hospitality and industrial work, from tenant fit-outs to ground-up buildings.
- Core-and-shell and tenant improvements
- Phased and occupied renovations
- Owner budget and GMP support
For general contractors
Full-scope, multi-trade estimates for commercial, multi-family and public projects, organized by CSI division, so you can check sub bids, close scope gaps and submit with confidence.
Mixed-use building, 4 stories
Illustrative example
Each market has its own pricing pressures and paperwork. We set up the estimate to match.
Office, retail, hospitality and industrial work, from tenant fit-outs to ground-up buildings.
Garden-style, podium and mid-rise apartments, senior living and student housing.
Schools, municipal buildings and other public work with prevailing wage and formal bid requirements.
One estimate that covers the whole job, so you know what every sub bid should include.
Supervision, temporary facilities, insurance, bonds and schedule-driven costs.
Clearing, excavation, utilities, paving and landscaping from the civil sheets.
Foundations, slabs, structure and masonry walls with all reinforcing.
Structural and misc. steel, rough carpentry and finish millwork.
Roofing, waterproofing, insulation, cladding, windows and storefront.
Framing, drywall, ceilings, flooring, paint and specialties.
HVAC, plumbing and fire protection from the M, P and FP sheets.
Power, lighting, fire alarm and data from the E-sheets.
Owner alternates, unit prices and allowances priced separately.
A summary for the owner, detail for your team and leveling sheets for buyout.
Bid summary by division
Div 01–33 roll-up
Sub bid leveling
Up to 3 bids per trade
Alternates & unit prices
Priced separately
Clarifications & exclusions
Bid-form ready
Every measurement is color-coded and tied to its sheet number.
| Item | CSI | Net | Unit | Waste | Gross |
|---|---|---|---|---|---|
| Cast-in-place concrete, all elements | 03 30 00 | 3,860 | CY | 5% | 4,053 |
| Structural steel framing | 05 12 00 | 412 | TON | 8% | 445 |
| Gypsum board, all types | 09 29 00 | 186,000 | SF | 10% | 204,600 |
| TPO roofing, 60-mil | 07 54 23 | 28,400 | SF | 5% | 29,820 |
| Aluminum storefront | 08 41 13 | 6,200 | SF | — | 6,200 |
| Galvanized ductwork | 23 31 13 | 48,600 | LB | 5% | 51,030 |
Live formulas: change any waste factor and the gross quantity updates.
Illustrative example. Key quantities for every division sit behind the bid summary, so you can check any sub's number.
Every division is priced from the same four cost groups, so the whole estimate reads consistently.
Cost group 01
Material pricing across every division, checked against current supplier quotes for the project's location.
Local market pricing
Cost group 02
Self-performed and subcontracted labor at union, open-shop or prevailing wage rates.
Wage determinations
Cost group 03
Cranes, lifts, hoists and site equipment tied to the project schedule.
Schedule-based
Cost group 04
General conditions, insurance, bonds, fee and contingency shown line by line.
Your fee & contingency
Support for everyone on your preconstruction and project teams.
Add capacity during heavy bid weeks without hiring, and keep your team focused on strategy.
Budgets and change order pricing during construction, checked against the original estimate.
Independent budgets for feasibility, lender reviews and contractor selection.
Know what each sub bid should cost before the numbers come in.
Leveling sheets show what each sub included and excluded.
Prevailing wage rates, bid forms, unit prices and alternates are handled.
Bid more projects without adding permanent overhead.
A lead estimator coordinates every trade in your estimate.
“We use Bidnora for overflow when we're bidding several jobs at once. Their numbers line up with the sub bids we get back, which is exactly what we need.”
Send what you have and we'll reply with a fixed price and delivery date before any work starts.
Need a single scope instead of the whole job? Every specialty trade has its own takeoff package.
Yes. We prepare full-scope estimates across Divisions 01 to 33, or any combination of divisions you need help with.
Send your bid documents and get a fixed quote and delivery date for a complete GC estimate.